[]
Your ongoing selection
Asset(s) Assets
Your quote 0

Your selection

Clear selection
{"event":"pageview","page_type1":"catalog","page_type2":"image_page","language":"en","user_logged":"false","user_type":"ecommerce","nl_subscriber":"false"}
{"event":"ecommerce_event","event_name":"view_item","event_category":"browse_catalog","ecommerce":{"items":[{"item_id":"EHT6620192","item_brand":"other","item_category":"photo","item_category2":"no_copyright","item_category3":"standard","item_category5":"not_balown","item_list_name":"search_results","item_name":"lindsey_oil_refinery_north_killingholme_north_lincolnshire_north_lincolnshire_uk_1981_b_w_photo","item_variant":"undefined"}]}}
Metadata Block (Hidden)

Contact us for further help

High res file dimension

Search for more high res images or videos

Lindsey Oil Refinery, North Killingholme, North Lincolnshire, North Lincolnshire, UK, 1981 (b/w photo)

Lindsey Oil Refinery, North Killingholme, North Lincolnshire, North Lincolnshire, UK, 1981 (b/w photo)
Asset - General information
Permissions
More info
Permission required for non-editorial use (inc book and magazine covers). Please contact us
Largest available format 5120 × 6528 px 38 MB
Dimension [pixels] Dimension in 300dpi [mm] File size [MB]
Large 5120 × 6528 px 433 × 553 mm 38.3 MB
Medium 803 × 1024 px 68 × 87 mm 918 KB
Leave the work to our dedicated Account Managers
License details
Your details
*
*
*
*
*
IMAGE number
EHT6620192
Image title
Lindsey Oil Refinery, North Killingholme, North Lincolnshire, North Lincolnshire, UK, 1981 (b/w photo)
Auto-translated text View Original Source
Date
1981 AD (C20th AD)
Image description

Photographer, John Laing plc; Builder, Laing Industrial Engineering and Construction Limited; An exterior view of the newly completed Alkylation Unit at Lindsey Oil Refinery Laing Industrial Engineering and Construction Limited (IEC) were involved in the construction of a Hydrofluoric Acid (HF) Alkylation Unit at Lindsey Oil Refinery. There were many other sub-contractors on site, with Foster Wheeler as the main contractors. The project team began work on the site in May 1979. To keep the site dry and speed up progress, a 'Plettac' covering made up of numerous small panels was constructed over the site. Work carried out by Laing IEC included the installation of thirteen thousand metres of pipework, 1400 valves, 30 heat exchangers, 18 drums and vessels, and 23 pumps.

Photo credit
© Historic England / John Laing Photographic Collection / Bridgeman Images
Image keywords
petrol / industry / technology / LATE 20TH CENTURY / OIL REFINERY

Similar Images