[]
Your ongoing selection
Asset(s) Assets
Your quote 0

Your selection

Clear selection
{"event":"pageview","page_type1":"catalog","page_type2":"image_page","language":"en","user_logged":"false","user_type":"ecommerce","nl_subscriber":"false"}
{"event":"ecommerce_event","event_name":"view_item","event_category":"browse_catalog","ecommerce":{"items":[{"item_id":"UIS5072208","item_brand":"other","item_category":"photo","item_category2":"no_copyright","item_category3":"standard","item_category5":"not_balown","item_list_name":"search_results","item_name":"construction_tunnels_construction_of_the_rotherhithe_tunnel_london_1906","item_variant":"undefined"}]}}
Metadata Block (Hidden)

Contact us for further help

High res file dimension

Search for more high res images or videos

Construction, Tunnels Construction of the Rotherhithe Tunnel, London, 1906

Construction, Tunnels Construction of the Rotherhithe Tunnel, London, 1906
Asset - General information
Usage restrictions from our Content Partners
More info
Not available to clients invoiced in the UK
Largest available format 3504 × 2875 px 1 MB
Dimension [pixels] Dimension in 300dpi [mm] File size [MB] Online Purchase
Large 3504 × 2875 px 297 × 243 mm 1.3 MB
Medium 1024 × 840 px 87 × 71 mm 928 KB

Add to cart

Contact us for other Usage Options

Pay for usage you need
Highest quality images
Editorial (Books, magazines and newspaper) - extended
Print and/or digital. Single use, any size, inside only. Single language only. Single territory rights for trade books; worldwide rights for academic books. Print run up to 5000. 7 years. (excludes advertising)
$175.00
Editorial (Books, magazines and newspaper) - standard
Print and/or digital. Single use, any size, inside only. Single language only. Single territory rights for trade books; worldwide rights for academic books. Print run up to 1500. 7 years. (excludes advertising)
$100.00
Corporate website, social media or presentation/talk
Web display, social media, apps or blogs. Not for advertising. All languages. 1 year + archival rights
$190.00
Personal website, social media or presentation/talk
Web display, social media, apps, or blogs. Use in academic and non-commercial presentations/talks included. Not for commercial use or advertising. All languages. 5 years
$50.00
Personal products
Personal Prints, Cards, Gifts, Reference. 5 year term. Not for commercial use, not for public display, not for resale. example: For use on birthday cards sent to family members.
$25.00

Taxes may apply to prices shown


Do you need support?
IMAGE number
UIS5072208
Image title
Construction, Tunnels Construction of the Rotherhithe Tunnel, London, 1906
Auto-translated text View Original Source
Location
Science Museum, London, UK
Medium
photography
Image description

Construction, Tunnels Construction of the Rotherhithe Tunnel, London, 1906. 'Front view of shield in shaft no 2', one of a series of 50 photographs chronicling the tunnel's construction. The Rotherhithe Tunnel passes beneath the River Thames joining Rotherhithe in South London with Shadwell in East London. Built by Sir Maurice Fitzmaurice between 1904 and 1908, the 4860 foot long tunnel was designed for the use of road vehicles, andæ remains the largest iron-lined subaqueous tunnel in the world. ©SSPL/Science Museum

Photo credit
SSPL/UIG / Bridgeman Images
Image keywords
20th century / worker / photography / 1900's / building site / tool / tunnel / river / thames / london londoner / england english / great britain - british / work

Similar Images